Work package 8: Production of the Final Facilitation Pack

Work package aim

To produce the Final Facilitation Pack for dissemination, drawing on the feedback from service users obtained during WP7 (Pilot Phase).

Work package Objectives

The overall aim of this WP can be split into 4 objectives:

  • Revision of the Draft Course Pack and Guidelines for Delivery (into the Final Course Pack)
  • Revision of the Draft Evaluation Tools and Guidelines for Use (into the Final Evaluation Toolkit)
  • Compilation of the Final Course Pack and Final Evaluation Toolkit (and the 2 sets of Guidelines) into the Final Facilitation Pack
  • Produce Final Project Report